SA LA GARONNE shored trench in front of the Toulouse war memorial

Expertise 04 / Complex works and operations

Complex works

Live networks, deep trenches, large-diameter pipes, busy areas: worksites where method makes the difference.

Depth up to 7 mDiameter up to Ø 2000 mmQualifications FNTP 5141 · 5161Setting City centre · sensitive areas

Our approach

The tighter the constraints, the more preparation counts.

A sewer seven metres down beneath a shopping street. A two-metre-diameter pipe to be renewed without interrupting the network. An operation at the foot of a monument, under the eyes of residents and tourists. These are the worksites SA LA GARONNE is called in for.

Our added value lies in preparation: construction studies, precise phasing, suitable shoring, urban logistics, coordination with operators and city departments. On site, experienced crews and plant sized for these conditions.

Crew safety, continuity of service, schedule compliance: on a complex worksite, these three requirements are never negotiable.

Situations

What we know how to do.

The configurations our crews are specifically equipped and trained for.

01
Live networks

Working on a network in operation without interrupting flow or distribution: pumping, bypass, section-by-section phasing.

02
Deep excavation

Trenches 6 to 7 metres deep with suitable shoring, management of water ingress and securing of the surroundings.

03
Large diameter

Laying and renewal of pipes up to Ø 2000 mm: lifting, bedding, assembly and dedicated checks.

04
Busy areas

City centre, pedestrian zones, around public facilities: reduced footprint, fine phasing, resident information.

05
Multi-utility coordination

Worksites amid dense utility networks: locating, protection, diversions and coordination of all parties.

06
Worksites under tight deadlines

Night work, short phases, operations planned around events or operating constraints.

SA LA GARONNE crew working on a live network in the city centre
Toulouse · live networkContinuity of service, whatever the conditions

Method

Prepare, secure, execute, verify.

A single method applied to every complex worksite, whatever its size.

Stage 01Studies and phasing

Constraint analysis, construction studies, detailed phasing, traffic management plan and safety plan.

Stage 02Safety measures

Engineered shoring, signage, access and flow management, protection of neighbouring structures and crews.

Stage 03Execution

Experienced crews and suitable plant: deep excavation, lifting, large-diameter laying, live networks.

Stage 04Testing and handover

Testing, inspections, controlled backfilling, like-for-like reinstatement and complete as-built documentation.

Resources

Crews and plant sized for the job.

35 employees, a dedicated plant fleet and 70 years of worksites across the Toulouse metropolitan area.

4 site crewsExperienced supervisionIn-house design officeSurveyor-draughtsmanTrench shoringEarthmoving plantJetting unitsRIC inspection robotRobotic rehabilitation equipmentIn-house workshop

Technical data

Trench depth6 to 7 m
Maximum diameterØ 2000 mm
FNTP qualifications5141 · 5161 · 5118 · 5221
Organisation4 crews · workshop · design office
Team35 employees
ExperienceSince 1956